Bukidnon IMO Operations and Maintenance Personnel conducted canal clearing and water level monitoring activities

 

Bukidnon IMO Operations and Maintenance Personnel conducted canal clearing and water level monitoring activities on April 1-3, 2020 to ensure efficient water delivery such as:

1. Repair of Drainage Canal at the downstream portion of Lat-1 at Batangan, Valencia City.

2. Repaired the cable of the lifting mechanism at the South Main Canal Intake Gate.

3. Opening of sluice way during the scheduled water cut off at the South Main Canal intake gate.

4. Ocular inspection conducted to determine areas that requires immediate repair during the water cut-off in preparation for the wet season 2020 cropping.